The LNM Institute of Information Technology

Tender Notifications

Tender Notifications

S.No. Tender Notification Last Date of Submission
1.Supply of Sofa Set, Center Table and Side Table20-04-2024
2.Supply of 16GB 2Rx8 and 32GB 2Rx8 DDR4 RAM for CSER Lab Desktops and Workstation13-04-2024
3.Supply of consumables for Robotic Lab15-04-2024
4.Supply and Installation of outdoor Unit of 1.5 TR Split AC (Make Carrier /Skoda)15-04-2024
5.Supply of Welding Research Lab consumables (Cut wires, SS Wires and Nickel Wires)13-04-2024
6.Supply of lab equipment for sand testing, shear testing, compression testing, shatter index testing13-04-2024
7.Supply of Sand Muller13-04-2024
8.Supply of Siemens PLC S7-300 CPU 313C Series and Festo Desktop Power Supply13-04-2024
9.HP 16GB RAM and 1TB External SSD13-04-2024
10.Development of Prototype and Development of Shell covered jacket cyclone Separator13-04-2024
11.Annual Servicing and Repairing work of WTP and STP Pumps with Motors13-04-2024
12.Supply and Installation of Fire Buckets with Stand and Supply of Heavy-Duty Nylon Rope13-04-2024
13.System- Network Audit13-04-2024
14.Supply of various consumables for Robotic Lab (sensor Kit, USB Camera, DC Power Supply SMPS, AC DC Power Supply, Digital Soldering Station, Grove Starter Kit)13-04-2024
15.Supply of Raw Material and Consumable for CRIA13-04-2024
16.Supply of Various consumables for CRIA (GPS Module, Servo Motor, Crimping tool, Wall Clock, robot Chassis, Caster Wheel, BO motor, MCU Development Board, Pressure Sensor, Raspberry Pi4, Digital Multimeter, Laser Range Finder, Grove Creator Kit, Combination Plier)13-04-2024
17.supply of TURTLEBOT3 Burger Rpi4 2 GB13-04-2024
18.P & L the flooring slab using tiles under the Canopy15-04-2024
19.Supply of permeability Tester for Moulding Sand15-04-2024
20.External Fire Fighting , Fire Extinguisher and Fire Alarm System Work of BH- 4 T2 Building31-03-2024
21.Area Pole lighting for BH-4T231-03-2024
22.10KVA Uninterruptible Power Supply (UPS) System for Networking Racks _ 1 No31-03-2024
23.1.5 TR Window Air conditioner (140 Nos.)31-03-2024
24.Supply & Installation of External Electrical Panels & Cabling Work31-03-2024
25.Supply and Installation of Normal & Cold-Water Cooler 150/150 Full Stainless steel (NCW FSS)31-03-2024
26.Supply and Installation of 250 LPH Capacity Reverse Osmosis (RO) System with Grade 304 Stainless Enclosed Body31-03-2024
27.System- Network Audit02-04-2024
28.Website Maintenance & Design of Alumni Association02-04-2024
29.Supply of Various consumables for CRIA (GPS Module, Servo Motor, Crimping tool, Wall Clock, robot Chassis, Caster Wheel, BO motor, MCU Development Board, Pressure Sensor, Raspberry Pi4, Digital Multimeter, Laser Range Finder, Grove Creator Kit, Combination Plier)02-04-2024
30.Provisioning of Transportation Services (Buses)15-04-2024
31.Security Services15-04-2024
32.Furniture for the meeting room in RIEP Building25-03-2024
33.Supply of Raw Material and Consumable for CRIA25-03-2024
34.Supply of various consumables for Robotic Lab (sensor Kit, USB Camera, DC Power Supply SMPS, AC DC Power Supply, Digital Soldering Station, Grove Starter Kit)25-03-2024
35.supply of TURTLEBOT3 Burger Rpi4 2 GB25-03-2024
36.Filing Patents on Smart Building and Healthcare25-03-2024
37.Supply, Installation, Testing and Commissioning of Emergency Announcement System with all features for BH-4 T231-03-2024
38.Supply, Installation, Testing and Commissioning of Network Equipment with all features for BH-4 T231-03-2024
39.Supply, Installation, Testing and Commissioning of Surveillance System with all features for BH-4 T231-03-2024
40.Expression of Interest for hiring of Shop (Veg Food Shop)25-03-2024
41.External Fire Fighting , Fire Extinguisher and Fire Alarm System Work of BH- 4 T2 Building31-03-2024
42.Area Pole lighting for BH-4T231-03-2024
43.10KVA Uninterruptible Power Supply (UPS) System for Networking Racks _ 1 Nos31-03-2024
44.1.5 TR Window Air conditioner (140 Nos.)31-03-2024
45.Supply & Installation of External Electrical Panels & Cabling Work31-03-2024
46.Supply and Installation of Normal & Cold-Water Cooler 150/150 Full Stainless steel (NCW FSS)31-03-2024
47.Supply and Installation of 250 LPH Capacity Reverse Osmosis (RO) System with Grade 304 Stainless Enclosed Body31-03-2024
48.Supply and Installation of 1 TR Split Type 5 Star Air Conditioner in Microwave Lab20-03-2024
49.Supply of Dell Vostro 3720SFF Desktop Computers15-03-2024
50.Photography & Videography and 360 degree virtual walkthrough17-03-2024
51.Designing, Manufacturing/Procurement, Installation, Testing and Commissioning of Lift at BH4 T2 building19-03-2024
52.P & L the flooring slab using tiles under the Canopy20-03-2024
53.Supply of Sofa Set, Center Table and Side Table20-03-2024
54.LNMIIT employees Group Medical Insurance Policy18-03-2024
55.HP 16GB RAM and 1TB External SSD15-03-2024
56.Supply and installation of chemical filled earthing electrode work with complete accessories and laying, fixing, repair of GI Strip earthing chambers with paint work15-03-2024
57.Supply of Windows 11 Home FPP Pack License for Computer Lab-315-03-2024
58.Fire Extinguishers Periodic Hydraulic Testing, Painting and Fire Hose Cabinet Glass replacement work15-03-2024
59.Consultancy service for multi-sensor interface with stm32 embedded platform for DRDO Project15-03-2024
60.Digital Marketing Ads Credit (Google Ad Credit, Meta Ad Credit and LinkedIn Ad Credit)15-03-2024
61.Water Cooler for Playground15-03-2024
62.Supply of Eval Board Software Define Radio, Eval Board TRXBoost, ZedBoard and Adalm Pluto15-03-2024
63.Supply of permeability Tester for Moulding Sand15-03-2024
64.Annual Servicing and Repairing work of WTP and STP Pumps with Motors09-03-2024
65.Supply of 36 watt 2x2 Panel Recess LED Light (Make Philips/CG/Orient _LTRAQ-36C-vo) and 36 watt 2 x 2 Surface Square Panel LED Light (make Philips/CG/Orient _LTSAQ-36-C)09-03-2024
66.Supply and Installation of Fire Buckets with Stand and Supply of Heavy-Duty Nylon Rope09-03-2024
67.Supply of 1-phase and 3-phase static KWH Meter09-03-2024
68.Supply of 18AH 12V SMF Lead Acid Batteries with buyback of Old Batteries09-03-2024
69.Supply and installation of Silencer for 625 KVA DG Set and Base Frame & Chimney Stand Paint work in DG Sets09-03-2024
70.Supply of Basler Camera09-03-2024
71.Supply of Plants, Plants with Pot Manure, Fertilizer, Insecticide, Pesticide, Anti Termite and Lawn Development15-03-2024
72.Supply of LFD Display 55 Inch09-03-2024
73.Supply of Electrical Material (Fan Capacitor, exhaust fan, flood light, Conduit Pipe and starter)09-03-2024
74.Repair and Maintenance of 8 mtr. Street Light Pole RCC Re-Foundation work09-03-2024
75.Supply, installation, Testing and commission work of Pole Lighting on Boundary wall09-03-2024
76.Supply of Mifare 1k Cards Contactless Cards for Library & Identify Automation09-03-2024
77.Supply of Electrical Material (Conduit Pipe, Bend, Junction Box)09-03-2024
78.Supply and installation of 304 grade SS Stand for Water Cooler and RO09-03-2024
79.Supply of Electrical Material (Electric Tape Roll, Socket, Switch, Top Plug)09-03-2024
80.Supply and installation of 20 LPH Capacity Reverse Osmosis Systems with enclosed body (Make- Kent Grand Star)09-03-2024
81.Supply of 50 watt LED Flood Light, 24 Watt Recess Mounting Panel LED Light, 45 watt Pole Mounting Round LED Light09-03-2024
82.Supply of Cubicle type LT Outdoor L&P Electrical Feeder Pillar Panel with Suitable Accessories09-03-2024
83.Annual Service and Routine Maintenance Work of Feeder and Block Electrical LT Panel09-03-2024
84.Supply of 16GB 2Rx8 and 32GB 2Rx8 DDR4 RAM for CSER Lab Desktops and Workstation09-03-2024
85.Supply of Hammer Drill Machine, Angle Grinder, Hammer Drill Bit and Electric Air Blower09-03-2024
86.Supply of New Batteries and buyback of old batteries09-03-2024
87.Supply and Installation of Workstation09-03-2024
88.Supply of Raspberry Pi 5, Active Cooler, Power Supply, Quadcopter Frame Kit, Quadcopter, Brushless Motor, Battery, Sensor Kit, electronics Compass Acceleration Sensor Module, Accelerometer Magnetometer Sensor Module09-03-2024
89.Testing of Transformer and V.C.B.09-03-2024
90.Supply of Center Valve, Shower Concealed Center Valve (Half Turn) and Shower Concealed Center Valve (Full Turn)02-03-2024
91.Supply of Floor Tiles and White Cement02-03-2024
92.Supply of Drone Kit with Flight Controller, Transmitter and Receiver, GPS and FPV Telemetry Module02-03-2024
93.Supply of Siemens PLC S7-300 CPU 313C Series and Festo Desktop Power Supply02-03-2024
94.Supply of Raspberry Pi 4 with Power Adapter USB-C Type, 32 GB Memory Card, HDMI Cable and Pi 4 Case02-03-2024
95.Supply and installation work of Power Socket and Lan Ports in CP Lab 1 and 229-02-2024
96.Supply of Projector (EPSON 2042) for RIEP Building29-02-2024
97.P & L of Transparent Repellant and Waterproofing29-02-2024
98.Removing Debris and other scrap items over the roof of hostels29-02-2024
99.Supply and installation work of Networking equipment.29-02-2024
100.Servicing of LT & HT Panel, VCB, ACB , Capacitor Bank, DG Set Alternator Earthing Testing and Transformers29-02-2024
101.Supply of Air-Cooling Machine Pad29-02-2024
102.Supply and installation of 1.5TR Split Type 5 Star Air Conditioner in Girls Hostel29-02-2024
103.Supply of Sinks(Hindware Flamingo Glossy Chrome Kitcher)24-02-2024
104.Supply of Single Bed Mattress -16 Nos.24-02-2024
105.Supply and Installation of 1 TR Split Type 5 Star Air Conditioner in Microwave Lab29-02-2024
106.Supply, installation, testing and commissioning of 30 KVA Three Phase online Modular UPS System with Batteries and MS Fabricated Stand24-02-2024
107.Development of Prototype and Development of Shell covered jacket cyclone Separator29-02-2024
108.Supply of Plastic Dust Bin24-02-2024
109.Wooden Work Hall No. 2 (Library)24-02-2024
110.Providing and Fixing of false ceiling/ false tiles repair and replacement work as already existing works in the buildings24-02-2024
111.Supply of Welding Manipulator and High Frequency Spark Generator24-02-2024
112.Supply and fixing of new roller curtain24-02-2024
113.Body repairing and fabrication work24-02-2024
114.Supply of 4 Core x 4 Sqmm Copper Conductor XLPE Insulated Armored Power Cable (Make : Polycab/KEI) and 4mtr. Galvanized Iron Pole24-02-2024
115.Supply and Installation of 500GB SSD and SATA Cable24-02-2024
116.Supply of Plastic Dust Bin and Door Mats24-02-2024
117.2mm Epoxy Floor coating in MME Hanger24-02-2024
118.Photography & Videography and 360 degree virtual walkthrough19-02-2024
119.Supply, installation, testing and commissioning of 30 KVA Three Phase online Modular UPS System with Batteries and MS Fabricated Stand10-02-2024
120.Supply and installation of External Electrical LT Panel and Cabling work10-02-2024
121.Body repairing and fabrication work10-02-2024
122.Supply of 45-watt and 36-watt external photo sensors for Automatic On/Off of LED street light (make Philips/CG/Orient) warranty 2 years10-02-2024
123.Supply of Drone Kit with Flight Controller, Transmitter and Receiver, GPS and FPV Telemetry Module10-02-2024
124.Supply of Raspberry Pi 4 with Power Adapter USB-C Type, 32 GB Memory Card, HDMI Cable and Pi 4 Case10-02-2024
125.Supply of Siemens PLC S7-300 CPU 313C Series and Festo Desktop Power Supply10-02-2024
126.Supply of PVC Insulated Single Core Flexible Copper Wires for routine R&M Activities10-02-2024
127.Supply of Geysers10-02-2024
128.Supply of Floor Tiles and White Cement10-02-2024